Why UAE Shipbuilding Buyers Choose Chunhua
For UAE buyers in the Shipbuilding sector, the standard configuration is MGH/MG large gantry, 150-300T capacity — engineered specifically for shipyard operations covering ship hull segments, marine engine assembly, offshore platforms.
Local market context: Free-zone manufacturing hubs. Our project engineering team is familiar with the regulatory and engineering norms of Middle East projects. CIF shipping to Dubai · Jebel Ali with all major liner schedules supported.
Project workflow: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD drawing + price within 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Dubai. Payment: 30% T/T deposit + 70% T/T or L/C at sight. Certification: CE, CCC, SGS available per project.
Shipbuilding Crane Models for UAE

MHB hoist semi gantry crane

MH electric hoist gantry crane
View
Flower stand hoist gantry crane
View
Rail-mounted container gantry crane
View
Shipbuilding gantry crane

Rail-mounted container gantry crane
View
European hoist gantry crane
View
MHE double hoist gantry crane
ViewCrane Quote for UAE Shipbuilding Project
Send your specs (capacity / span / lifting height / port of Dubai) — we reply with model + CAD drawing + CIF price within 4 hours, in Arabic/English.
WhatsApp +86 193 9277 7259